Flow Back

We have a special unit to give support in the fracturing and multi fracturing operations in non-conventional oil and gas fields.
The Flow Back Tacker Unit helps Coiled Tubing, Wireline, Slickline, Snubbing and Fracturing units.
FLOW BACK UNIT 15,000 psi

 

Main Characteristics:

‣   Cutting-edge remote control cabin
‣   3-levelled-Telescopic sub structure, with self-adjusting ladder
‣   15k psi Sand Trap
‣   2 x Gas Boosters

 

Plug Catcher:

‣   15 k psi- dual Plug Catcher
‣   Valves 4 1/16” manual 4 1/16” hydraulic 3 1/16” hydraulic 2 1/16” manual (API 6A)
‣   Hydraulic Choke

Manifold:

‣  3 1/16” / 15k Hydraulic Valve Manifold (API 6A)
‣  3 1/16” / 15k Gate Valve Manifold


Flow Lines:

‣  2" - 1502 15k psi
‣  3” - 1502 15k psi

 

Auxiliary equipment

They can be changed and adapted according to the specifications and requirements of the customer.
‣   Test Pits with gas/mud separator
‣   Power station
‣   Living quarters, company man, meeting rooms
‣   Barrel Pumps
‣   Water and gas oil tankers
‣   Lighting Towers


To get more information about technical specifications of this service,
please contact our commercial department

Repair and Snubbing

Wells with problematic casing reduce production quality and pollute formations.
Our services contribute to quickly recover the performance of the well in only one intervention, saving significant costs.

 

When trying to optimize and accomplish production goals, there is a variety of correction operations to do in a well.
These can include repairing the casing or replacing it, using in each case, tools and special systems in order to maintain,
repair or improve the productivity.

Well-Abandonment

We carry out comprehensive projects, provide products and services for well-abandonment.
For zone isolation or well-abandonment services we carry out the appropriate processes,
with the right human resources and adequate technology.
We have an extensive knowledge of methodologies and technologies as well
as our customers' needs and  government regulations.

This allows us to develop technical, innovative and sustainable solutions that help our customers and providers
while we take care of the well-abandonment with a strict compliance with the Provincial and National laws,
resolutions and regulations protecting the environment.

TACKER provides solutions, selecting the tools that best adapt to the well to get good results
in respect to the costs of the equipment.
We have plugs for zone isolation and for well-abandonment.
We also have cement retainers in cementing operations through tubing, coiled-tubing and drill pipe.


TACKER SRL is registered as a well-abandonment operating company. Provincial Register N° 10. 
Deputy Hydrocarbon and Energy Secretary. Neuquen Province.
In process of registration in the Deputy Hydrocarbon and Mining Secretary, Rio Negro province.

Tree Saver / Casing Saver

Tree Saver and Casing Saver Tacker tool services offer more options and less risks, extending the life cycle of the production trees.
The operations in fracturing, acidization and chemical treatments of up to 15,000 psi damage the production trees.
The high-efficiency wellhead isolation tool is an innovative solution to save time, to reduce costs and risks during high-pressure stimulation treatments.

 

It is a tool used in stimulation operations with pressure through a surface Christmas Tree.
Its design allows to keep the operation pressure and the pressure of the hydraulic activation of the tool isolated in an independent way.
This tool can be used to operate from tubing 2 ⅜ “ and to casing 7 ⅝ “. 
It works through a hydraulic power unit that is included in the operation. 
It is made of high resistance steel and it can be used in any kind of stimulation that should be operated without taking out the production tree or the wellhead BOP out.

Download Assembly Scheme
Esquema de Ensamble



 

FEATURED PRODUCTS


 
 
Tree Saver Model TST1 1002
Download Data Sheet
 
Tree Saver Model TST2 1003
 
BOP Protector Model TSC3 1007
 
Frac Head Model 2359
 
Model 2318 Hydraulic Power Unit HPU