We have a special unit to give support in the fracturing and multi fracturing operations in non-conventional oil and gas fields.
The Flow Back Tacker Unit helps Coiled Tubing, Wireline, Slickline, Snubbing and Fracturing units.
FLOW BACK UNIT 15,000 psi

 

Main Characteristics:

‣   Cutting-edge remote control cabin
‣   3-levelled-Telescopic sub structure, with self-adjusting ladder
‣   15k psi Sand Trap
‣   2 x Gas Boosters

 

Plug Catcher:

‣   15 k psi- dual Plug Catcher
‣   Valves 4 1/16” manual 4 1/16” hydraulic 3 1/16” hydraulic 2 1/16” manual (API 6A)
‣   Hydraulic Choke

Manifold:

‣  3 1/16” / 15k Hydraulic Valve Manifold (API 6A)
‣  3 1/16” / 15k Gate Valve Manifold


Flow Lines:

‣  2" - 1502 15k psi
‣  3” - 1502 15k psi

 

Auxiliary equipment

They can be changed and adapted according to the specifications and requirements of the customer.
‣   Test Pits with gas/mud separator
‣   Power station
‣   Living quarters, company man, meeting rooms
‣   Barrel Pumps
‣   Water and gas oil tankers
‣   Lighting Towers


To get more information about technical specifications of this service,
please contact our commercial department